Electrical installation | Commissioning

Safety on your construction sites has top priority.

Within the scope of turn-key solutions, it goes without saying that we also assume responsibility for the complete electrical installation.
Your advantage: one company in charge of all your questions as well as a coherent concept from a single source.

We carry out:

  • Site installation and supplies
  • Extension of cable routes
  • Installation and assembly (of e.g.: switchgear cabinets, control points, etc.)
  • Installation and connection of all necessary cables and conductors
  • Building installation (e.g. safety lighting)
  • On-site installation (e.g. core drilling, cable sealing, fireproofing, raised floors, switch room equipment, etc.)
  • Testing of the electrical installation according to DIN VDE
  • Assembly and testing of the required earthing and protective measures

KIMA is certified by TÜV Nord according to DIN ISO 45001. Our goal is to maintain and protect the health of our employees and all project participants on your construction sites.

This includes the following measures:

  • individual risk assessments of our working environment on the construction site
  • annual safety training at our company
  • First-aid training (>75% of our employees are trained first-aiders)
  • Occupational medical examinations of our employees depending on the area of responsibility
  • PPE (customised for corresponding risk areas)
  • etc.

Commissioning

KIMA's experienced engineers carry out the commissioning of your plants and process controls. This essentially includes:

 

"Cold" commissioning:

  • Commissioning of the bus systems
  • Setting and parameterisation of our scope of supply (e.g. frequency converter, SIPROTEC protection devices, measuring transducers, etc.)
  • I/O test of the entire periphery (sensors, actuators)
  • Function test of the safety-relevant emergency shutdowns
  • Manual operation / interlocking test (e.g. external systems)
  • Automatic operation (without material)

"Warm" commissioning:

  • Coordination with the people in charge of the plant
  • Start-up of the plant (with material)
  • Automatic sequences
  • Documentation by means of special test protocols, e.g. drive and measuring point control sheets
  • Training and instruction of production and maintenance personnel after commissioning
  • Process optimisation jointly with the customer
  • Production support
  • Individual on-call service (e.g. during trial operation)

 

In case of complex processes, we offer our customers a pre-commissioning (FAT - Factory Acceptance Test). State-of-the-art simulation methods can be used to simulate process characteristics and thus test the user software in advance.